Plastic piping Systems for water supply and for buried and above-ground drainage and sewerage under pressure - Unplasticized poly (vinyl chloride) (PVC-U) Part 2: Pipes
Plastic piping Systems for water supply and for buried and above-ground drainage and sewerage under pressure - Unplasticized poly (vinyl chloride) (PVC-U) Part 2: Pipes
Plastic piping Systems for water supply and for buried and above-ground drainage and sewerage under pressure - Unplasticized poly (vinyl chloride) (PVC-U) Part 2: Pipes
The production of reconditioned fire-fighting equipment - Part 1: Portable and wheeled (mobile) rechargeable fire extinguishers <(>&<)> Part 2: Fire hose reels and above-ground hydrants.
Achieved BIM for Design, Construction and Commissioning in accordance with ISO 19650-1:2018, ISO 19650-2:2018, and the implementation of a Security-Minded Approach in accordance with BS EN ISO 19650-5:2020 following the assessment of Project Delivery and Collaborative Working Maturity with project stakeholders
Achieved BIM for Design, Construction and Commissioning in accordance with ISO 19650-1:2018 and ISO 19650-2:2018 following the assessment of Project Delivery against this project and Collaborative Working Maturity with project stakeholders